05 / FLOOR LAYOUT
Data centre floor planning See the hall before anyone pours the slab.
Draw the room to its real walls, drag out rows of racks, and add the doors, columns, cooling units and power panels around them. The floor lives in the same project as the racks, cabling and power, so cable lengths measure from where racks stand and the review checks the layout with everything else.
Explore the example first; an account is needed to save your own work.

THE JOB TO DO
A hall layout nobody checks against the racks
The room is often a CAD drawing, the racks a spreadsheet and the cable lengths a guess made from neither. When a row moves, nothing tells you that a door no longer clears it, that a cooling unit now serves twice the heat, or that a cable run has grown. Railyard keeps the floor and what stands on it in one model.
THE WORKFLOW
Lay out a floor in three moves
Draw the room
Set the hall's size, ceiling height, raised floor and floor loading, then drag the corners to the real walls. Add doors on the walls, columns where the structure is, and anything else in the way.
Drag out rows
Draw a block of rows on the Plan: Railyard builds the rows and racks, faces them into hot and cold aisles and can contain the aisles. Place cooling units and power panels, then feed each rack's PDUs from a panel.
Review and look round
The review checks clearances, door fit, cooling capacity and reach, containment, power-panel load and floor loading. Open the 3D view, colour it by power, heat or fill, and select a rack to open its elevation.
THE RESULT
One floor for designers, installers and facilities
Everyone discusses the same positions: where each rack stands, which way it faces, which panel feeds it and how far its cables run. Move a row and the cable lengths, aisle labels and review findings follow it.
Designing this is free on Community. Cable schedule is a deliverable: exporting it needs a Project Pass for the estate or a Pro, Team or Partner plan. The raw project file is free on every plan. See pricing →
SEE IT IN CONTEXT
Start with a real example estate.
Follow one guided task, then inspect how the rack, cables, power and export fit together.